Saturday, September 27, 2014

August 29 - September 25, 2014: Closing up shop for the winter.

After finding out the day before that the boat could not be pulled until the following week, we decided to get our car from Daytona Beach and utilize the long weekend to also visit Ger's sister Cath in Homosassa FL. We checked into a car rental to drive to DB, but the number got pretty big with the one-way drop charges, food, gas and a night in a hotel. So we got on line, and found a flight that including the airfare, taxi to the airport, and checked baggage was a big savings! A pleasant surprise. So the following day we caught a 7:00 cab to the airport and had the car in hand and driving away from the dealer where we purchased it (they stored it for us free of charge), by 3:00 in the afternoon. Footnote: never buy a car out of state - too much hassle with paperwork!

We had a nice visit with Ger's sister Cath, and headed back to AYB and the boat on Wednesday - a one day drive. Next day they pulled R Island (that is when we found the rope wrapped around the prop as seen in the previous blob entry).

They then directed us to a covered slip so we could do some work on the boat - but be out of the rainy weather. This is also where R Island will spend the winter- nice and dry, but cold at times! We spent the next 2 weeks touching up worn/damaged/faded areas on the exterior teak with 6 coats of varnish and then a two-part sealer over the everything.

This all got complicated by Ger slipping and falling down the steps to the master stateroom on the third day and badly bruising his ribs on the right side. No trip to the doctor, just self-medicated according to the instructions on the Mayo Clinic web site (probably stupid, but slowly getting better).

We also packed up all of our clothes and food and loaded them into the car. Also, due to the cold winters in that area, had to box up all the varnish, cleaning products, waxes, and anything else that would freeze and get it into the car. All got finished by the evening of the 18th. Then on the 19th, the boatyard winterized the engine, generator, a/c units, fresh water system, and waste system and we closed her for the winter and left to visit our son Gary and his family in suburban Washington DC. We were able to catch Sunday breakfast with Mike and Lois, our cruising friends from Inch-N-Along who were at Gangplank marina in DC.

Then on Monday the 22nd, we headed west for our 2355 mile trip home. We spent the nights in Nashville TN, Oklahoma City OK, and Gallup NM. The new Honda CRV was great and gave us a 30% increase in mileage from our 20003 CRV. Also a great music system and very nice ride.

We are planning to return to the boat and begin our 2015 adventures to Lake Champlain and the Erie Canal in late March next year. This blog will be silent till then. Hope you enjoyed sharing in our great adventure.....

Barge going by AYB

View from our covered slip

R Island in her slip


The exterior of the "shed" where she is.

A little fog over the water our last day.

August 26-28, 2014 Potomic River to Great Bridge VA

Sorry to be tardy in updating this blog, but a combination of poor wifi connections and a busy schedules played a big role as you will see. Excuses, not reasons.

Day 1: Potomac to the Rappahannock. After 4 days of waiting out the rain and wind, we were up at 5:30 and away from the dock of Point Lookout Marina at 6:25. It was a nice ride down Smith Creek and into the Potomac with a big red sun rising. It's a little hard to see the crab pots at that time of day, but we did a good job of remembering where they were from our trip into the marina 4 days earlier. One strange thing: we saw blackbirds picking over an osprey nest for small twigs and ??? - while the osprey just sat there and watched. Guess we need to consult with some birder folks to figure that one out!
The run southward on the Bay seemed to last forever. First off we were going slow to make certain the rudder etc. behaved. And then there was the following sea with 3 foot waves and constant steering adjustments to keep on line. We did see a barge loaded with rock headed south from Havre de Grace and a bunch of birds hitching a ride! Later saw a lighthouse covered with birds - must have been the destination!
We stopped after 49 miles back at Dozier's Regatta Point and the dock-master met us at the pump out station and after doing our business we simply walked the boat forward to our usual spot. We quickly secured the boat, got the power and a/c working, paid our fees, grabbed a loaner car and headed to the pizza parlor for a late lunch and some time off. Stopped at the hardware store for a grease gun, some grease, and bug spray. The spiders had taken over the stern and port side of the boat and the flies decided to start eating for their winter hibernation. Ortho "Home Defense" works great and lasts a long time!
Water level at Pt. Lookout at it's highest.

Rock barge with birds!

Birds at vacation resort!


Day 2: Rappahannock to Hampton Roads. Our regular slip at Dozier's is at the end of a long fairway and right next to the main pier - leaving no maneuvering room for a boat without a bow thruster. So with the wind against us, we backed the boat all the way out of the fairway, past the 15 boats on either side, and into the main channel - went very smoothly with Judie keeping watch and coaching Ger all the way. We may need to consider a new slip if we stop there in the spring on our way north.

Nice wind coming out of the Rappahannock but the Bay had 3-4 foot rollers on our port stern and we were in for another long day. We passed Wolf Point Light, the same light that had surprised us out of the fog/rain on the way up in June, but this time it was visible from 4 miles away!  There was lots of ship traffic on the Bay and we always had at least one to keep track of. We finally made the turn at Thimble Point Light and into the Hampton Roads area and found beautiful water with comfortable six inch waves. We made our way to the City of Hampton and Bluewater Yachting Center.

The Marina is excellent - with new floating docks, great restrooms, a wonderful - but busy - restaurant and nice folks. We had to adjust our slip and the first location was down a very narrow fairway, so they put us on a small "T" dock - but about as far from the office and facilities as we could get. No matter, when we were ready we made a combined trip to the showers and dinner. Later  that evening the Wednesday night sailboat races were finishing just pat R Island's dock, and we watched the boats "race" past in a dying wind and sunset. Very relaxing with a glass of wine and the great views.
Interesting large "landing craft" type of boat transporting a large fork lift.

Hampton Roads Light and Hampton University buildings.
 
Day 3: Hampton Roads to Great Bridge VA and the Atlantic Yacht Basin. Timing the tide, we left the dock about 7:30 and headed south. We passed Naval Station Norfolk on our port side and once again marveled at the ships there for refit and re-supply. Warship 57 left just as we passed her slip and it was interesting to see the tugs do their work and the sailors standing on the ship perimeter. As we continued past the cities of Norfolk and Portsmouth, we saw lots of activity and lots of pilot boats and tugs - must have been moving day on the water!
 
After about 14 miles and just before the Gilmerton Lift Bridge, there was a loud bag and vibration at the stern. We immediately reduced speed to idle, and checked the stern and engine room for trouble. Finding nothing, we continued on slowly but made ready the anchor just in case we needed to stop quickly or lost something in the drive train for some reason. We were lucky at the remaining bridges and lock as we arrived right at opening time and we called bridge/lock operators and other boaters to express our situation and concerns. Christina the sailboat, also headed to Atlantic Yacht Basin (AYB), was very cooperative but Maverick the tugboat was a ass using his size and having a lack of communication skills.
 
Next thing we know, the bilge pump alarm is going off and we are thinking about where/when we will sink! Luckily, it activated for only short periods and a review of the bilge found it keeping up with the water flow but no source for the water. By now we have only one lock and one bridge and about one mile to go, so we prayed and continued on.
 
We finally made it to AYB and tied-up to the main dock. After consulting with James, the boatyard manager, I discovered a leak in the fresh water system behind the water heater. Why it happened I do not know, but we essentially wound up pumping the water from our 110 gallon fresh water tank thru the broken fitting and into the bilge!  I was able to fix it and pump out the remaining water, dry out the electrical cable tray it had leaked into, and all was well on that end. They were unable to pull the boat out of the water until the following week to check on the vibration, but when they did, we found a rope wrapped around the prop. Our "line cutter' had cut it - the loud bang we heard, and it was the cause of the vibration by interfering with the prop wash as it went over the rudder.
 
 
Tug pushing Warship 57

Full view of the ship
 Standing the rail
A medical ship
Warship 55 in dry dock
R Island being lifted from the water
The problem rope!